The PMBOK Control Quality process focuses on product quality as well as project quality because much of the quality improvement and quality control effort emanates from the many tools and techniques that are tailored to meet the project needs.

All Our Courses

Control Quality in your PMBOK project

The control quality process is there to make sure that the project and product results with the quality management plan.

The quality management plan, qualitative methods, and quality metrics are applied to along with the work performance measurements and the deliverables themselves in order to determine whether the work has been done correctly.

In addition, this process validates that approved changes have been implemented correctly. The definition of control qualityis: “the process of monitoring and reporting results of executing the quality activities to assess performance and recommended necessary changes.”

Control Quality In PMBOK - The Projex Academy | PRINCE2 PMP APM LEAN6SIGMA (1)

Preventing a problem or defect during design is better than finding defects after the deliverable is complete – and then having to repair it.

Controlling quality ensures that the project deliverables line up with the quality standards established in the project quality plan by using appropriate tools and techniques such as testing, inspection, and control in order to adhere to customer requirements.

A very close relationship exists between quality control and scope verification.

Perform quality control is all about comparing deliverables against the quality plan and quality metrics so that the deliverables are correct and meet the requirements. Once this has been done the validated deliverables go through the verify scope process for customer acceptance.

While controlling quality, the project manager checks that approved change requests were implemented has approved, and this is one of the aspects of project scope of that is analysed and controlled.

When planning for quality the techniques are used to plan measurements, tolerances, and procedures. However, it is within this process that those measurements, tolerances, and procedures are applied. The results from applying the measurements are inputs to the perform quality assurance process.

Controlling Quality for deliverables

The close relationship exists between control quality and scope verification; we compare deliverables against the quality plan to ensure they are correct and meet the requirements, the validated deliverables are input to the Verify Scope process to gain customer acceptance.

  • Deliverables are created in the direct and manage project execution process
  • The deliverables are validated as correct in the perform quality control process
  • Validated deliverables are ready for inspection and acceptance in the verify scope process
  • Accepted deliverables are ready for the close project or phase process

Control quality - the Quality Management Plan

As mentioned above the quality management plan is the major input for the control quality process and will normally include the following information:

  • Existing flowchart so by processes that you are looking to improve
  • Upper and lower control and specification limits contained within the control charts
  • Information is referenced such as sampling numbers, the sample criteria, measurements and variable sampling.
  • Quality metrics, these can be any measurement that must be met for the results to meet the quality requirements.
  • Quality checklist ensures that the proper steps are being followed in order to comply with aspects such as processes, regulations or policies.

The work performance measurements come from the control scope, control schedule, and control cost processes.

The close relationship exists between control quality and scope verification; we compare deliverables against the quality plan to ensure they are correct and meet the requirements, the validated deliverables are input to the Verify Scope process to gain customer acceptance.

However, the performedcontrol quality process is also where change requests are validated, as the approved change requests are an input to this process as shown by this diagram:

Control Quality In PMBOK - The Projex Academy | PRINCE2 PMP APM LEAN6SIGMA (2)

The quality measurements are recorded and passed on to the perform quality assurance process.

The deliverables and their results are validated. If they are not compliant then a change request is raised in order to bring them into compliance.

Any changes are validated as appropriate.

Various documentation will need to be updated including the project management plan containing the quality management plan and the process improvement plan, any quality standards or metrics, and appropriate organisational process assets lessons learned and quality checklists.

Perform quality control

This is the process of monitoring and recording results of executing the quality activities to assess performance and recommended necessary changes. Be clear that we are talking about results here, not deliverables, so keep in mind that a large amounts of quality control is associated with results.

However another aspect of perform quality control is assessing whether the project is performing well in addition to whether the processes are working correctly.

Because this is the quality process, you must remember that prevention is preferred over inspection, because preventing a problem or defect in the design process is far better than finding it after the deliverable is complete and then having to repair it.

Perform quality control –the inputs

The quality management plan provides direction for the perform quality control process and typically provides the following information:

  • Control charts information including the upper and lower control limits and the upper and lower specification limits
  • The number of items to sample if you statistical sampling, the criteria he was sampling four, and the measurements for attributes or variable sampling
  • Flowcharts of an existing process that you are looking to improve

The quality management plan will also define the roles and responsibilities for quality control and identify the organisational process assets such as any policies or procedures that must be followed.

Quality metrics are those specific measurements that must be met in order for the results to meet the quality requirements.

The quality checklists hope to make sure that all the proper steps are being followed so that you comply with policies, regulations, or processes.

The information in the quality plan, metrics, and checklists is used with the work performance measurements along with the deliverables.

The work performance measurements come from the control scope, control schedule, and control cost processes.

The work performance measurements are used to determine whether or not the project performance is acceptable, and the deliverables are used to determine whether the product performance is acceptable.

Validating change requests

The perform quality control process is where change requests are validated.

The perform integrated change control process uses the change request, the change log, analysis, decisions, document updates, communication, and implementation.

Verification takes place in this process, and the approved change requests are an input to perform quality control. The implementation of those change requests are reviewed, if the change requests are implemented as directed, they are validated.

When validating the change in the perform quality control process, it is important to ensure that the work breakdown structure, schedule, budget, resource requirements, and all other documentation are updated and consistently reflect the approved change.

I bring to this discussion a wealth of knowledge and practical experience in project management, specifically in the context of the Project Management Body of Knowledge (PMBOK). My expertise is rooted in years of hands-on involvement in planning, executing, monitoring, and controlling projects across various industries.

Now, delving into the content you provided, let's break down the key concepts and elaborate on the PMBOK Control Quality process:

Control Quality in PMBOK:

  1. Purpose of Control Quality: The Control Quality process is crucial for ensuring both project and product quality. It aligns with the quality management plan and utilizes various tools and techniques tailored to meet project needs.

  2. Components of Control Quality:

    • Quality Management Plan: This is a major input for the Control Quality process. It encompasses essential information such as existing flowcharts, upper and lower control limits, specification limits, sampling details, quality metrics, and checklists.

    • Qualitative Methods and Quality Metrics: These are applied along with work performance measurements and deliverables to determine whether the work has been executed correctly.

    • Validation of Approved Changes: Control Quality ensures that approved changes have been implemented correctly, and it validates the results of executing quality activities.

  3. Relationship Between Quality Control and Scope Verification: There is a close relationship between quality control and scope verification. Deliverables are compared against the quality plan in the control quality process to ensure correctness and alignment with requirements. Validated deliverables then proceed to the Verify Scope process for customer acceptance.

  4. Quality Planning Techniques:

    • Techniques used during quality planning involve planning measurements, tolerances, and procedures.
    • The measurements derived from planning are inputs to the Perform Quality Assurance process.
  5. Change Requests in Control Quality:

    • The Control Quality process validates change requests, ensuring that approved changes have been implemented correctly.
    • Change requests are inputs to Control Quality, and the process reviews the implementation of these changes.
  6. Perform Quality Control Process:

    • This process involves monitoring and recording results of executing quality activities.
    • It assesses performance and recommends necessary changes, emphasizing prevention over inspection.
    • Work performance measurements from control scope, control schedule, and control cost processes are crucial inputs.
  7. Inputs to Perform Quality Control:

    • The Quality Management Plan guides the Perform Quality Control process.
    • Inputs include control charts, sampling information, flowcharts, roles and responsibilities, metrics, and checklists.
  8. Validation of Change Requests:

    • The Perform Quality Control process is where change requests are validated.
    • This involves ensuring that the work breakdown structure, schedule, budget, and other documentation are consistently updated to reflect approved changes.

In summary, the Control Quality process in PMBOK is a comprehensive and integral aspect of project management, ensuring that project and product quality align with established standards and requirements. It involves meticulous planning, monitoring, and validation to deliver successful project outcomes.

Control Quality In PMBOK - The Projex Academy | PRINCE2 PMP APM LEAN6SIGMA (2024)

FAQs

What are the tools and techniques that PMBoK lists for the Control Quality process? ›

There are seven basic quality tools identified as appropriate for use in both the quality management plan and control quality processes. They are known as Ishikawa's seven basic tools of quality: cause-and-effect diagrams, flowcharting, check sheets, Pareto diagrams, control charts, histograms and scatter diagrams.

What is the input of Control Quality? ›

Inputs to Quality Control Process

The following are considered to be inputs for Control Quality activities: Project Management Plan. Quality metrics – Predefined metrics that are used to measure quality are applied as needed to determine the level of quality conformance at key specific milestones.

What is control quality in PMP? ›

Quality control has to do with monitoring the project metrics, identified in the quality planning phase, to ensure those metrics are performing at satisfactory levels. Quality control also includes understanding the concept of variation as well as how to effectively communicate with data.

What are the quality control methods in PMP? ›

Strategies used for quality control in project management include audit, benchmarking, cause and effect diagrams, checklists, flowcharts, histograms, pie charts, and statistical sampling. Each of these techniques helps teams carry out the quality control cycle tasks.

What are the three elements of quality control? ›

Quality control consists of inspection, measurement and testing to verify that the project outputs meet acceptance criteria defined during quality planning.

What are the four main components of quality control? ›

In general, quality management consists of these four pillars: quality control planning, quality control, quality assurance, and quality improvement. However, the manufacturing industry has a more specific view of what these pillars mean to their overall operation.

What is quality control examples? ›

The quality control used in a business is highly dependent on the product or industry. For example, in food and drug manufacturing, quality control includes ensuring the product does not make a consumer sick, so the company performs chemical and microbiological testing of samples from the production line.

How many tools and techniques are there in Pmbok? ›

The main strength of the PMBOK® Guide is that it provides a comprehensive range of useful tools and techniques. In total there are 132 tools and techniques described or referred to. Question: Where in PMBOK can we find list of those 132 tools and techniques?

What are the 7 tools of quality control includes? ›

What are the 7 basic quality tools?
  • Stratification.
  • Histogram.
  • Check sheet (tally sheet)
  • Cause and effect diagram (fishbone or Ishikawa diagram)
  • Pareto chart (80-20 rule)
  • Scatter diagram.
  • Control chart (Shewhart chart)

What are the 7 basic tools used in quality control or TQM? ›

These seven basic quality control tools, which introduced by Dr. Ishikawa, are : 1) Check sheets; 2) Graphs (Trend Analysis); 3) Histograms; 4) Pareto charts; 5) Cause-and-effect diagrams; 6) Scatter diagrams; 7) Control charts.

How many tools and techniques are there in Pmbok 6th edition? ›

Tools and Techniques in PMBOK 6th edition has seven groups of 132 different project management tools and techniques. These tools are grouped as per their purpose. The group names describe the intent of what needs to be done.

Top Articles
Latest Posts
Article information

Author: Virgilio Hermann JD

Last Updated:

Views: 6238

Rating: 4 / 5 (41 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Virgilio Hermann JD

Birthday: 1997-12-21

Address: 6946 Schoen Cove, Sipesshire, MO 55944

Phone: +3763365785260

Job: Accounting Engineer

Hobby: Web surfing, Rafting, Dowsing, Stand-up comedy, Ghost hunting, Swimming, Amateur radio

Introduction: My name is Virgilio Hermann JD, I am a fine, gifted, beautiful, encouraging, kind, talented, zealous person who loves writing and wants to share my knowledge and understanding with you.